Blog/Buying video

How long does it take to make a developer tutorial video?

Hours and weeks are different questions. Published timelines, where the days go, and what slows a tutorial down.

Kevin Blanco··6 min read·Evaluation

The short answer

A single developer tutorial takes about 20 hours of work and, at most studios that publish a timeline, two to six weeks on the calendar. DevReel's first tutorial ships around day 10, with first numbers by day 14. The calendar time goes mostly to scripting and to waiting on reviews, not to recording.

01

Hours and weeks are different questions

Stripe's team has said in a DevRelCon talk that one tutorial takes around 20 hours of work. That's effort. The calendar is something else: twenty hours can land in a week or stretch over a month, depending on how fast the script gets approved and how many rounds the cut goes through.

So when you ask a company how long, ask both. How many hours, and how many days until it's live.

02

What companies publish

WhoPublished timelineWhere it was published
Draft.dev3 to 6 weeks per video, then a video every 2 weeks after onboardingIts video tutorials page, checked November 2026
Apollo StudioAbout three weeks for a customer storyIts Contra listings
Represent StudioRoughly two weeks, according to one roundupA third-party roundup, not the company
DevReelFirst tutorial shipped around day 10, first numbers by day 14devreel.mov/how-it-works

03

Where the days go

  1. Days 1 to 3

    Use the product, plan

    Install it, break it, take notes, agree the viewer and the number. A team that skips this saves two days and loses a week to rewrites later.

  2. Days 3 to 5

    Script, then your engineers' review

    The script locks when an engineer on your side signs it off. This is the step that most often stalls.

  3. Days 5 to 8

    Record and cut

    Screen capture, voice, motion where an idea needs a picture. The first cut goes out for review.

  4. Days 8 to 10

    Revisions and packaging

    Changes back in hours, then the title, chapters, transcript and Shorts. Shipped.

  5. Day 14

    First numbers

    Early signals against the baseline you agreed on day 1.

That's our own timeline, as our How it works page sets it out, and a rule of thumb rather than a promise for every product. A tutorial filmed on site, or one with heavy motion graphics, takes longer.

04

What slows a tutorial down

  • 01

    Waiting for review

    An engineer who reviews the script in a week instead of a day adds a week. Book their time when the project starts.

  • 02

    A product that changes mid-production

    Record against a pinned version, and show it on screen.

  • 03

    No agreed viewer

    If nobody decided who the tutorial is for, the argument happens during the edit, which is the slowest place to have it.

  • 04

    Review by committee

    One person approves. Everyone else sends notes to that person.

  • 05

    Starting from nothing

    The first tutorial is the slowest. The format, the setup and the review loop make the next ones faster.

FAQ

Questions people ask

How long does it take to make a developer tutorial video?

About 20 hours of work, and two to six weeks on the calendar at most studios that publish a timeline. DevReel's first tutorial ships around day 10.

What's the slowest part?

Usually waiting for reviews, especially the engineer's sign-off on the script. Book that review time when the project starts.

Do later tutorials go faster?

Yes. Once the format, the recording setup and the review loop are settled, each new tutorial needs less setup and fewer rounds.

How fast can a tutorial ship if it's urgent?

Faster than the usual timeline when the script can be approved the same day and the product is stable. Tell the company the date first, and ask what they'd cut to hit it.

DevReel

How we do it at DevReel

Kickoff on day 1, roadmap by day 3, script locked by day 5, first cut by day 8, shipped around day 10, first numbers by day 14. Revisions come back in hours, in a shared Slack channel with the people doing the work.

Cloudinary's videos usually average around 400 views. Ours passed 9,000 in the first week. For ngrok, watch hours tripled and subscribers went from about 450 to over 800 in the first week.

Cloudinary views

9,000+

in the first week, against a usual ~400

ngrok watch hours

3×

subscribers from ~450 to 800+ in the first week

Now the hard part

Give us the date you need it by, and we'll tell you honestly if it's possible.

Kevin Blanco founded DevReel. He has made 500+ developer-tool videos and spoken at 80+ developer conferences.

Keep reading